This load bank is used in the generator and ups industries.
Generator load bank testing equipment for sale.
For example if a generator is used as a backup for services associated with loss of life or serious injury such as in a hospital setting the testing requirements are much more frequent.
Search for used load bank.
Aaron equipment company s load bank testing eliminates the issue of unburned fuel buildup by allowing your generator s engine to reach its full operating temperature.
Find asco ford john deere generac caterpillar noise com cummins gm onan allis chalmers and kubota for sale on machinio.
The load bank can be programmed to automatically sense how much power the generator is using and activate the proper steps to maintain a minimum of load.
Visit us to get a quote or see more power hvac equipment.
Explore our fleet of load banks generators for testing validating and maintaining power sources.
Load bank testing load bank testers are used in place of a facilities load.
Its important to test uninterruptible power systems because if they are not able to handle a load or remain powered everything that depends upon that system could be at risk.
Load banks are used in two common practices generator load testing and automatic load sensing.
Another type of test performed is the generator load bank test.
With a resistive inductive load bank full power system testing is possible because the provided impedance supplies currents out of phase with voltage and allows for performance evaluation of generators voltage regulators load tap changers conductors switchgear and other equipment.
The 4100 is designed for dedicated on site testing.
This device develops an electrical load to test for generator output power.
Generator source runs a restistive load bank test on every generator we own and sell.
The frequency schedule for load bank testing on a generator often depends on how the generator is classified and what it is a standby for.
The asco 4100 load bank is designed for permanent outdoor installation when 50 to 150 kw loading is required.
Upon completion of a successful load bank test which is timed out with increasing intervals until it is stepped up to a full load.
Load banks can be defined as a self contained unitized systematic device that includes load elements system that tests emergency generator and associated systems.
The load bank will sense the increase in consumption and instantaneously deactivate itself.
Get rental information on load banks from united rentals.